The contractor designs the building and directs the pace of construction. The strength of design-build is in the coordination. The contractor, in turn, hires subcontractors who handle the different aspects of the project. In a design-build project, the only contract is with the contractor. This contract binds the contractor to design and construct the project according to the owner’s instructions and specifications. ![]() The owner enters into a contract with a single contractor. What’s Design-Build?ĭesign-build is a project delivery system where an entity (a construction company) handles the entire design and construction process. ![]() The two most widely used project delivery systems are – design-build and design-bid-build. It is the system the owner of a project uses to organize and finance the design and construction of that project. Project delivery is critical to a construction project. The only point of deviation was the hiring of the architect who worked on the project’s appearance. Gustave Eiffel’s company designed and built the structure. ![]() The construction of the Eiffel Tower follows the design-build approach. Even at the present level of technological advancement, it would take full coordination to complete a project of that magnitude in just 22 months. This duration was a technical feat at the time of completion. The construction of the Eiffel Tower started in 1887 and ended in 1889, spanning just 22 months.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |